Global Industrial Automation Sourcing

EN  /  CN
NANKMOSEmpower Industry. Advance Future.
Send Inquiry

Sourcing Tips

New, Used or Refurbished Automation Parts: What to Ask

Questions to clarify condition, inspection notes and delivery context when comparing automation part options.

6 min readUpdated 2026NANKMOS Technical Team
Send Inquiry Upload Parts List
New, Used or Refurbished Automation Parts: What to Ask

Condition is part of the specification for an industrial automation spare part. Before comparing options, state what the application can accept and what documentation the maintenance team needs.

Automation part condition review before quotation
Reference image for this sourcing guide.

Define the acceptable condition

Say whether new, used or refurbished options are acceptable. If alternatives can be reviewed separately, ask for them to be identified clearly rather than combined into one assumption.

Ask what can be confirmed

Request available condition notes, photographs, inspection details and documentation for the specific model. The exact information depends on the part and should be confirmed during the inquiry.

Keep model and condition separate

Send the exact part number first, then add quantity, application and condition preference. This keeps the sourcing review focused on the right hardware.

What to confirm before comparing options

Condition should be discussed together with the exact part number. Ask whether the unit is new, unused surplus, previously installed, refurbished, or available only as a compatible alternative. A clear condition description helps the sourcing team recommend the right inspection scope and prevents a quotation from being compared on price alone.

For used or refurbished automation parts, request available nameplate photos, revision information, test notes, and packaging details. These records do not replace an application review, but they give the maintenance team a practical basis for deciding whether the part is suitable for a repair window.

Questions that improve an RFQ

  • What is the full model or catalog number, including suffixes?
  • How many units are required and when are they needed?
  • Is a specific condition acceptable, or should new and refurbished options both be considered?
  • Which destination country and delivery method should be used?

When details are uncertain, send the old module label and a short description of the system. NANKMOS can confirm availability, condition options, lead time, compatibility, and documentation by email before you make a purchasing decision.

Related guides

View all guides
Legacy PLC Backplane and Chassis Identification

Legacy PLC Backplane and Chassis Identification

How to identify backplanes, racks and chassis when a legacy PLC system needs a replacement or expansion component.

Read guide
Bently Nevada Monitoring Modules: Inquiry Checklist

Bently Nevada Monitoring Modules: Inquiry Checklist

A focused checklist for identifying monitoring modules, probes and related Bently Nevada system components.

Read guide
PLC and DCS Modules for Marine and Offshore Maintenance

PLC and DCS Modules for Marine and Offshore Maintenance

How to describe marine and offshore automation replacement needs when sourcing PLC, DCS, I/O and communication modules.

Read guide
Quality and Delivery Questions for Control Modules

Quality and Delivery Questions for Control Modules

Questions to include about condition review, packaging and delivery when requesting industrial automation control modules.

Read guide

Send your part number, photos or nameplate.

Our team will verify, check availability, and reply with options within 24 hours.

[email protected]+86 18359268345WhatsApp
Global Sourcing NetworkAccess to current, legacy and discontinued parts.
Quality ReviewInspection scope confirmed by quotation.
Secure PackingAnti-static and protective packaging options.
Delivery PlanningOptions discussed for destination and urgency.
Engineering MatchingHelp identifying compatible parts and systems.